Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-paginate domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/oscarindus/domains/oscarindus.com/public_html/wp-includes/functions.php on line 6114
Quality Policy – Oscar Indus

Quality Policy

Quality Policy

  • OSCAR INDUS is committed to a Policy of Continual Improvement in the field of Design and Fabrication of Products, and Services by way of a structured Quality Management System established and implemented in accordance with ISO 9001:2015.

  • This is achieved through:

  • Total compliance with all applicable Statutory and Regulatory requirements and other relevant provisions.
  • On-time delivery of quality products and services at all times to meet the demands of our customers, thereby ensuring total customer satisfaction.
  • Continuous endeavour to improve our technical capabilities to ensure that our products meet the latest performance and efficiency standards.
  • Regular on-line monitoring of employee performance and cost parameters to ensure that our products and services are available to our customers at the most competitive prices without any compromise on quality.
  • Frequent interaction with all section of our employees to ensure that they are on board with full awareness of the Quality Policy and expectations of the Organization.

QA Procedures Followed:

  • Welding Procedures (WPS, PQR) for GTAW, SMAW, FCAW, GMAW Process for Carbon Steel and Stainless Steel Materials, SS & Inconel Weld Overlay on Carbon Steel as per ASME Sec IX.
  • Welder Performance Qualification (WPQ/WOPQ) for GTAW, SMAW, FCAW, GMAW Process of Carbon Steel & Stainless Steel Qualified Welders as per ASME Sec IX.

NDE Procedures

  • Radiographic Testing (RT)
  • Liquid Penetrant Testing (PT)
  • Ultrasonic Testing (UT)
  • Magnetic Particle Testing (MT)
  • Visual Examination (VT)
  • Written Practice

General Procedures

  • Hydro Test
  • Pneumatic Test
  • Post Weld Heat Treatment
  • Weld Repair
  • Calibration
  • Welding Consumable Control
  • Material Control & Traceability
  • Positive Material Identification (PMI)
  • Pre-Heating & Post-Heating
  • Ferrite Measurement
  • Hardness
  • Factory Acceptance Test (Fat)
  • Production Test Coupon Procedure
  • Pickling and Passivation

Testimonials